| DESCRIPTION |
When one or more of the 'required' atomic tests of an AMA/Billable panel
This report identifies AMA/Billable panel tests from the previous calendar
month that have one or more 'required' atomic tests that are still in a
pending status and require review.
remain in the PENDING status by the roll-up date, the laboratory sends the
individual atomic level CPT codes for each verified test to PCE. On the
roll-up date the laboratory software searches the previous calendar month
for panel tests in the pending status.
The roll-up date can be found in the PROCESS PANEL DATE field (#620) of the
LABORATORY SITE file (#69.9).
|