Name | Value |
---|---|
NAME | ENPLM16 |
MENU TEXT | Approval of Project Application |
UPPERCASE MENU TEXT | APPROVAL OF PROJECT APPLICATIO |
PACKAGE | ENGINEERING |
ROUTINE | ENPL9 |
DESCRIPTION | This option controls the Chief Engineer's and VAMC Director's sign off on the project application. The Security Key ENPLK001 controls the Chief Engineer's approval. The Security Key ENPLK002 controls the VAMC Director's approval. The Chief Engineer must sign off before the VAMC Director. Both must approve before the project application can be transmitted electronically to higher approval authorities. |
CREATOR | POSTMASTER |
TYPE | run routine |