ENPLM16 (1588)    OPTION (19)

View in ViViaN Menu
Name Value
NAME ENPLM16
MENU TEXT Approval of Project Application
UPPERCASE MENU TEXT APPROVAL OF PROJECT APPLICATIO
PACKAGE ENGINEERING
ROUTINE ENPL9
DESCRIPTION
This option controls the Chief Engineer's and VAMC Director's sign
off on the project application.  The Security Key ENPLK001 controls
the Chief Engineer's approval.  The Security Key ENPLK002 controls the
VAMC Director's approval.  The Chief Engineer must sign off before the
VAMC Director.  Both must approve before the project application can
be transmitted electronically to higher approval authorities.
CREATOR POSTMASTER
TYPE run routine