PRCP DUEIN CALCULATE/UPDATE (2509)    OPTION (19)

View in ViViaN Menu
Name Value
NAME PRCP DUEIN CALCULATE/UPDATE
MENU TEXT Update Calculated Due-Ins/Outstanding Transaction
UPPERCASE MENU TEXT UPDATE CALCULATED DUE-INS/OUTS
ROUTINE PRCPRDI0
DESCRIPTION
This option will print a report showing the calculated due-ins or
The report should be run before doing the update so the results
can be verified first.  The report will show a listing of the
calculated due-ins compared to the total due-in quantity stored
in the inventory point.  If the due-ins disagree, the update
should be performed.  The report may not agree with the 'Due-In
Item Report' since the 'Due-In Item Report' uses the stored values
and not the calculated values.
 
The update will remove all due-ins stored in the inventory point
and reset the due-ins to the newly calculated values.
will update the inventory point with the calculated due-ins.
 
The calculated due-ins are based on transactions (2237's) and
purchase orders which have not been received in after a specified
date.  The date entered should represent the date the last
transaction or purchase order was received in (probably no later
than 6 to 9 months in the past).
 
CREATOR USER,ONE
TYPE run routine