
File CONSTRUCTION_PROJECT(6925) Data List
| PROJECT NUMBER |
FMS # |
REPORTING PERIOD (Month/Year) |
% CONST DOCS. COMPL |
CONST. CONTRACT # |
CONST FUND CONTROL PT |
CONSTRUCTION AWARD |
P&H LABOR TO DATE |
P&H MATERIALS TO DATE |
TOTAL P&H |
% CONSTRUCTION COMPLETE |
OLD CONST. CONTRACT # |
OLD FCP (CONST.) |
OLD ORIG. CONSTRUCTION AWARD |
OLD P&H LABOR TO DATE |
OLD P&H MATERIAL TO DATE |
CONTR. NAME |
CONTR. ADDR1 |
CONTR. ADDR2 |
% DESIGN DEV. COMPL |
CONST SA ADDITIONS (#) |
CONST SA ADDITIONS ($) |
CONST SA DEDUCTIONS (#) |
CONST SA DEDUCTIONS ($) |
CONST SUPPL (NET $) |
TOTAL CONST OBLIGATION |
TIME EXTENSION (DAYS) |
% DESIGN PROGRAM COMPL |
TOTAL PROJ OBLIGATION |
OLD CONST. ADD. (#) |
OLD CONST. ADD. ($) |
OLD CONST. DED. (#) |
OLD CONST. DED. ($) |
OLD TIME EXTENSION (DAYS) |
REMARKS |
PROGRESS NOTE |
OLD PROGRESS NOTE |
OLD REPORTING PERIOD |
OLD PROJECT TITLE |
OLD MONTHLY UPDATE |
OLD MEDICAL CENTER |
OLD FUNDING YEAR (A/E) |
OLD FUNDING YEAR CONST. |
OLD APPROVED CONST. FUNDING |
OLD APPROVED A/E FUNDING |
OLD STATUS |
OLD DESIGN METHOD |
DATE OF LAST ELECT. 10-0051 |
LAST REPORTING PERIOD |
*SCOPE REDUCED |
*CURRENT A/E ESTIMATE |
PROGRAM |
APPROVAL LEVEL |
*AVG. WORK FORCE (P&H) |
*MAN HOURS (P&H) |
WAGES (P&H) |
FACILITY TYPE |
PROJECT CATEGORY |
BUDGET CATEGORY |
NHCU BEDS (NEW) |
NHCU BEDS (RENOVATED) |
NHCU BEDS (CONVERTED) |
EPA REPORTABLE |
EPA REPORTING CATEGORY |
BONUS CATEGORY |
AMBULATORY CARE PERCENTAGE |
OLD PROGRAM |
OLD FACILITY TYPE |
OLD DIVISION |
OLD PROJECT CATEGORY |
OLD BUDGET CATEGORY |
OLD NHCU BEDS (NEW) |
OLD NHCU BEDS (RENOVATED) |
OLD NHCU BEDS (CONVERTED) |
OLD EPA REPORTABLE |
OLD EPA REPORTING CATEGORY |
OLD BONUS CATEGORY |
OLD CONSTRUCTION METHOD |
OLD GROSS SQUARE FEET |
OLD % SCHEMATICS COMPLETE |
OLD % CD COMPLETE |
OLD % CONSTRUCTION COMPLETE |
OLD % DD COMPLETE |
OLD % DESIGN PROGRAM COMPLETE |
EMERGENCY/INTERIM APPLICATION |
EQPMT OVER $250K APPLICATION |
CAPITAL LEASE PROGRAM |
CITATIONS |
PROJ CATEGORY >75% SCOPE |
NHCU AUTHORIZED BEDS |
NHCU CONVERSION |
DIVISION |
BUILDING NUMBER |
BLDG DISPLAY |
BLDG OCCUPANCY |
H089 |
5 YR FACILITY PLAN FY |
FIVE YR PLAN STATUS |
5 YR PLAN STATUS DATE |
PLANNED CONSTRUCTION METHOD |
OLD NHCU AUTHORIZED BEDS |
OLD NHCU CONVERSION |
ENVIRONMENTAL ASSESSMENT REQD |
ACTIVATION RESOURCES REQ IN FY |
RECURRING ALL OTHER $ |
ADDITIONAL FTEE |
RECURRING PS |
EQUIPMENT $ |
NONRECURRING ALL OTHER |
TRAVEL .007 |
EQUIPMENT OVER $250K |
NET BED CHANGE |
PROJECT DESCRIPTION (SHORT) |
JUSTIFICATION (SHORT) |
WORKLOAD |
ENVIRONMENT IMPACT STMT REQD |
ADDITIONAL DOCUMENTATION REQD |
FURTHER REQD ACTION |
EVALUATOR |
DATE OF EVALUATION |
ACQUIRES OR DISPOSES LAND |
A1 LAND USE TEXT |
AFFECTS WETLANDS/FLOOD PLAINS |
A2 LAND USE TEXT |
INVOLVES STORM WATER RUNOFF |
A3 LAND USE TEXT |
CONFLICTS W LOCAL ZONING |
A4 LAND USE TEXT |
DISLOCATES PEOPLE/RESIDENCES |
A5 LAND USE TEXT |
PROJECT TITLE |
MONTHLY UPDATES |
DESIGN PROGRAM START (PLANNED) |
DESIGN PROGRAM COMP. (PLANNED) |
ADVERTISE FOR A/E (PLANNED) |
SELECT A/E (PLANNED) |
A/E AWARD (PLANNED) |
AFFECTS PROTECTED FAUNA/FLORA |
A6 LAND USE TEXT |
OUTSIDE CONST GT 10000 SQ FT |
B1 CONSTRUCTION TEXT |
INCREASE OFF SITE TRAFFIC >10% |
B2 CONSTRUCTION TEXT |
SIGNIF ALTER OFF SITE TRAFFIC |
B3 CONSTRUCTION TEXT |
INVOLVE HISTORIC AREA/BLDGS |
B4 CONSTRUCTION TEXT |
EMISSION/WATER QUALITY PROBLEM |
C1 EMISSION/TOXINS TEXT |
PUBLIC CONTROVERSY |
D1 PUBLIC CONTROVERSY TEXT |
CONFLICT LOCAL/STATE REGS |
D2 PUBLIC CONTROVERSY TEXT |
OVERLOAD UTILITY SYS CAPACITY |
D3 UTLITY OVERLOAD TEXT |
VAMC PRIORITY |
MCPS SCORE |
START SCHEMATICS (PLANNED) |
REGIONAL PRIORITY |
ESTIMATED COST FOR 5 YR PLAN |
ESTIMATED A/E COST (FYFP) |
ESTIMATED CONST COST (FYFP) |
TOTAL M AND R COSTS |
TOTAL BSEA COSTS |
TOTAL BSER COSTS |
TOTAL MI COSTS |
NRM TOTAL COST |
*CONTINGENCY PCT MI/MA |
CONTINGENCY DOLLARS |
NRM CONTINGENCY PCT |
MI/MA CONTINGENCY PCT |
IMPACT COST |
COMPLETE SCHEMATICS (PLANNED) |
START DESIGN DEV. (PLANNED) |
COMPL. DESIGN DEV. (PLANNED) |
TECHNICAL SERVICES PCT |
TECHNICAL SERVICES $ |
MINOR/MAJOR CONST COSTS |
TOTAL PROJECT COST |
NET PARKING CHANGE |
DOMINOS |
START/AWARD CD (PLANNED) |
FDP UPDATE COMPLETED |
VAMC MINOR/MINOR MISC SCORE |
MI/MM CITATION POINTS |
MI/MM SPACE POINTS |
MI/MM ENERGY POINTS |
MI/MM CATEGORY POINTS |
MI/MM VAMC PRIORITY POINTS |
REGION SCORE |
TOTAL PROJECT SCORE |
SIR RATING |
ENERGY CONSERVATION PROJECT |
APPROVED IN 5YR ENERGY PLAN |
SITE ISSUES |
HISTORICAL ISSUES |
ENVIRONMENTAL ISSUES |
SEISMIC ISSUES |
COMPL. CONST. DOCS. (PLANNED) |
START L/T REVIEW (PLANNED) |
START AUDIT REVIEW (PLANNED) |
HAZARDOUS MATERIALS ISSUES |
TRANSPORT ISSUES |
PARKING ISSUES |
*IMPACT ISSUES |
CHIEF ENGINEER APPROVED |
CHIEF ENGINEER NAME |
CHIEF ENG SIGN DATE |
VAMC DIRECTOR APPROVED |
VAMC DIRECTOR/DESIGNEE NAME |
VAMC DIRECTOR SIGN DATE |
ISSUE IFB/SBA (PLANNED) |
COMPL. L/T REVIEW (PLANNED) |
COMPL. AUDIT REVIEW (PLANNED) |
PROJ APPLICATION STATUS |
BID OPEN/NEGOTIATION (PLANNED) |
TOTAL FACTORED SQUARE FOOTAGE |
NRM FACILITY PRIORITY POINTS |
NRM FACTORED SQ FOOTAGE POINTS |
NRM CATEGORY POINTS |
NRM CITATION POINTS |
NRM ENERGY POINTS |
NRM CONSTRUCTION COST |
NRM BONUS POINTS |
NRM VAMC SCORE |
SPACE USE FOR PRIORITIZATION |
SEISMIC AREA |
CONSTRUCTION AWARD (PLANNED) |
LONG DESCRIPTION |
LONG JUSTIFICATION |
DATE TRANSMIT IN 5YR PLAN |
TRANSMITTER 5YR PLAN |
DATE TRANSMIT PROJ APPLICATION |
TRANSMITTER PROJ APPLICATION |
CONSTRUCTION START (PLANNED) |
IMPACT JUSTIFICATION |
LEASE TYPE |
FY AWARD LEASE |
FY RENT STARTS |
ESTIMATED LUMP SUM COST |
ESTIMATED ANNUAL RENT COST |
CONST. COMPLETE (PLANNED) |
PROPOSED LEASE TERM |
RENTABLE SQ FT |
EXISTING SPACE ANNUAL RENT |
EXISTING SPACE RENTABLE SQ FT |
MEDICAL CENTER |
FUNDING YEAR - A/E |
FUNDING YEAR - CONST |
*APPROVAL LEVEL |
ACTIVATION (PLANNED) |
COMMUNICATION LOG |
OLD DESIGN PROGRAM START (PL) |
OLD DESIGN PROGRAM COMP. (PL) |
OLD ADVERTISE FOR A/E (PL) |
OLD SELECT A/E (PL) |
OLD A/E AWARD (PL) |
OLD START SCHEMATICS (PL) |
OLD COMPLETE SCHEMATICS (PL) |
OLD START DD (PL) |
OLD COMPLETE DD (PL) |
OLD START CD (PL) |
OLD COMPLETE CD (PL) |
OLD START L/T REVIEW (PL) |
OLD START AUDIT REVIEW (PL) |
OLD ISSUE IFB (PL) |
OLD COMPL. L/T REVIEW (PL) |
OLD COMPL. AUDIT REVIEW (PL) |
OLD BID OPEN (PL) |
OLD CONSTRUCTION AWARD (PL) |
OLD CONSTRUCTION START (PL) |
OLD CONST. COMPLETE (PL) |
OLD ACTIVATION (PL) |
DESIGN PROGRAM START (REVISED) |
DESIGN PROGRAM COMP. (REVISED) |
ADVERTISE FOR A/E (REVISED) |
SELECT A/E (REVISED) |
A/E AWARD (REVISED) |
START SCHEMATICS (REVISED) |
COMPLETE SCHEMATICS (REVISED) |
START DESIGN DEV. (REVISED) |
COMPL. DESIGN DEV. (REVISED) |
START/AWARD CD (REVISED) |
COMPL. CONST. DOCS. (REVISED) |
START L/T REVIEW (REVISED) |
START AUDIT REVIEW (REVISED) |
ISSUE IFB/SBA (REVISED) |
COMPL. L/T REVIEW (REVISED) |
COMPL. AUDIT REVIEW (REVISED) |
APPROVED CONSTRUCTION |
BID OPEN/NEGOTIATION (REVISED) |
CONSTRUCTION AWARD (REVISED) |
CONSTRUCTION START (REVISED) |
CONST. COMPLETE (REVISED) |
ACTIVATION (REVISED) |
OLD DESIGN PROGRAM START (REV) |
OLD DESIGN PROGRAM COMP. (REV) |
OLD AUTHR. LTR. REC'D. (REV) |
OLD ADVERTISE FOR A/E (REV) |
OLD SELECT A/E (REV) |
OLD A/E AWARD (REV) |
OLD START SCHEMATICS (REV) |
OLD COMPLETE SCHEMATICS (REV) |
OLD START DD (REV) |
OLD COMPLETE DD (REV) |
OLD START CD (REV) |
OLD COMPLETE CD (REV) |
OLD START L/T REVIEW (REV) |
OLD START AUDIT REVIEW (REV) |
OLD ISSUE IFB (REV) |
OLD COMPL. L/T REVIEW (REV) |
OLD COMPL. AUDIT REVIEW (REV) |
OLD BID OPEN (REV) |
OLD CONSTRUCTION AWARD (REV) |
OLD CONSTRUCTION START (REV) |
OLD CONSTRUCTION COMP. (REV) |
OLD ACTIVATION (REV) |
DESIGN PROGRAM START (ACTUAL) |
DESIGN PROGRAM COMPL. (ACTUAL) |
APPROVED A/E FUNDING |
TOTAL FUNDS APPROVED |
AUTHORIZED (ACTUAL) |
ADVERTISE FOR A/E (ACTUAL) |
SELECT A/E (ACTUAL) |
A/E AWARD (ACTUAL) |
START SCHEMATICS (ACTUAL) |
COMPLETE SCHEMATICS (ACTUAL) |
START DESIGN DEV. (ACTUAL) |
COMPL. DESIGN DEV. (ACTUAL) |
START/AWARD CD (ACTUAL) |
COMPL. CONST. DOCS. (ACTUAL) |
START L/T REVIEW (ACTUAL) |
START AUDIT REVIEW (ACTUAL) |
ISSUE IFB/SBA (ACTUAL) |
COMPL. L/T REVIEW (ACTUAL) |
COMPL. AUDIT REVIEW (ACTUAL) |
BID OPEN/NEGOTIATION (ACTUAL) |
STATUS |
CONSTRUCTION AWARD (ACTUAL) |
CONSTRUCTION START (ACTUAL) |
CONST. COMPLETE (ACTUAL) |
ACTIVATION (ACTUAL) |
OLD DESIGN PROGRAM START (ACT) |
OLD DESIGN PROGRAM COMP. (ACT) |
OLD AUTHORIZED (ACT) |
OLD ADVERTISE FOR A/E (ACT) |
OLD SELECT A/E (ACT) |
OLD A/E AWARD (ACT) |
OLD START SCHEMATICS (ACT) |
OLD COMPL. SCHEMATICS (ACT) |
OLD START CD (ACT) |
OLD COMPLETE CD (ACT) |
OLD START L/T REVIEW (ACT) |
OLD START AUDIT REVIEW (ACT) |
OLD ISSUE IFB (ACT) |
OLD COMPL. L/T REVIEW (ACT) |
OLD COMPL. AUDIT REVIEW (ACT) |
OLD BID OPEN (ACT) |
OLD CONSTRUCTION AWARD (ACT) |
OLD CONSTRUCTION START (ACT) |
OLD CONST. COMPLETE (ACT) |
OLD ACTIVATION (ACT) |
OLD START DD (ACT) |
OLD COMPLETE DD (ACT) |
DESIGN METHOD |
A/E CONTRACT # |
A/E FUND CONTROL POINT |
A/E AWARD AMOUNT |
A/E STUDY |
A/E SCHEMATICS |
A/E SITE SURVEY |
A/E DESIGN DEVELOPMENT |
A/E CONST DOCUMENTS |
A/E SITE VISITS |
A/E CONST PER SERVCS |
A/E OTHER SERVICES |
A/E SUBTOTAL |
A/E SA ADDITIONS (#) |
A/E SA ADDITIONS ($) |
A/E SA DEDUCTIONS (#) |
CONSTR. METHOD |
GROSS SQUARE FEET |
A/E SA DEDUCTIONS ($) |
A/E SA NET ($) |
A/E OBLIGATED |
A/E NAME |
A/E ADDR1 |
A/E ADDR2 |
% SCHEMATICS COMPLETE |
OLD A/E CONTRACT # |
OLD FCP (A/E) |
OLD A/E AWARD AMOUNT |
OLD A/E OBLIG. (STUDY) |
OLD A/E OBLIG. (SCHEMATICS) |
OLD A/E OBLIG. (SITE SURVEY) |
OLD A/E OBLIG. (DD) |
OLD A/E OBLIG. (CD) |
OLD A/E OBLIG. (SITE VISIT) |
OLD A/E OBLIG (CONST PER SRVC) |
OLD A/E OBLIG. (OTHER) |
OLD A/E SA ADDITIONS (#) |
OLD A/E SA ADDITIONS ($) |
OLD A/E SA DEDUCTIONS (#) |
OLD A/E SA DEDUCTIONS ($) |
*INIT. NOTIFICATION - SBA |
*WD & SPECIFICATIONS - SBA |
*CONTR INIT PROP - SBA |
*REQ FOR PRE-AWARD - SBA |
*COMPL OF PRE-AWARD - SBA |