| Name | Value |
|---|---|
| NAME | DSIYUTL4 EQWOCHK ASK WO |
| TAG | EQWOCHK |
| ROUTINE | DSIYUTL4 |
| RETURN VALUE TYPE | ARRAY |
| DESCRIPTION | EQWOCHK depending upon the Equipment IEN or the user's DUZ - it is across the board for all equipment. The GUI should check and only ask about an incoming inspection work order for single or multiple ADD entries (not on edit). But there are also checks within VistA to see whether or not to ask and what the default response should be. The GUI can use this RPC when equipment is loaded as this setting is not |
| RETURN PARAMETER DESCRIPTION |
RETURN PARAMETER
p3: Explanation
DSIYRET(1)=following pieces
p1: 0 if you should NOT ask about an incoming inspection work order
1 if the GUI should ask to create an incoming inspection work order
p2: 0 if the default answer for creating a work order is "NO"
1 if the default answer for createing a work order is "YES"
|