
| Name | Value |
|---|---|
| NAME | DSIYWOPM GETPMPR PM PROCEDURE |
| TAG | GETPMPR |
| ROUTINE | DSIYWOPM |
| RETURN VALUE TYPE | GLOBAL ARRAY |
| WORD WRAP ON | TRUE |
| DESCRIPTION | DSIYWOPM GETPMPR PM PROCEDURE returns the Engineering Section Shop Performing Maintenance information, including the procedure associated with the maintenance. |
| INPUT PARAMETER |
|
| RETURN PARAMETER DESCRIPTION |
Example of the information returned
procedures lines 1-n
Title - Engineering Section Shop Performing Maintenance
Frequence - Frequency: M MONTHLY
Hours - Hours (Estimated): not specified
Material Cost - Material Cost (Estimated): : not specified
Level - Level: not specified
Procedure Procedure: BED01
|