PSU*3.0*34 (5754)    BUILD (9.6)

Name Value
NAME PSU*3.0*34
DATE DISTRIBUTED 2004-09-08 00:00:00
PACKAGE FILE LINK PHARMACY BENEFITS MANAGEMENT
REQUIRED BUILD
  • PSU*3.0*19
    ACTION:   Don't install, leave global
TYPE SINGLE PACKAGE
DESCRIPTION OF ENHANCEMENTS
 Phase I of the Inpatient Medications Requirements for the Special Focus
      OR*3*213   ORDER ENTRY/RESULTS REPORTING V. 1.0
      PSU*3*34   PHARMACY BENEFITS MANAGEMENT V. 3.0
 
 Patches PSS*1*79, OR*3*213, and PSU*3*34 contain changes to support the
 following enhancements in PSJ*5*110:
 
 1. The Extend Stop Date on Renewal enhancements will allow an order to be
 renewed without creating a new order. Editing of the start date will no
 longer be allowed during the renewal process. In addition, limits have
 been set on the length of time after an order expires that it may be
 Group IRA project consists of four patches. The patches are combined in
 renewed. This is outlined in the BCMA 2001 Special Focus Report,
 Requirement #11.
 
 2. The Complex Order enhancements will change the way complex orders are
 handled by linking complex components (child orders) together. If the
 actions Finish, Verify, Discontinue, or Renew are taken on one child
 order, the user will be alerted that the action must be taken on all of
 the complex component orders in the set. The user will then be prompted
 to take the appropriate action on each child order in the complex order
 set. This is outlined in BCMA 2001 Special Focus Report, Requirement #8.
 host file PSJ_PSS_OR_PSU_110.KID in order to simplify installation at VHA
  
 3. The STAT and NOW Order Notification enhancements will alert users
 subscribing to new mail group PSJ STAT NOW PENDING ORDER when a pending
 STAT or NOW order has been received from Computerized Patient Record
 System (CPRS) V. 1.0. Users subscribing to the new mail group PSJ STAT
 NOW ACTIVE ORDER will receive an alert when a STAT or NOW order is made
 active. This is outlined in BCMA 2001 Special Focus Report, Requirement
 #12.
 
 Changes to PHARMACY BENEFITS MANAGEMENT (PBM) V. 3.0 have been included
 facilities. Installation of this host file should be coordinated among
 in this patch to address the following issues:
 
 1. Problem:  The changes to renewed orders introduced by the Inpatient
 Medications Requirements for the Special Focus Group IRA, Phase I project
 will allow renewed orders to have an active status for periods of time
 that exceed the current PHARMACY BENEFITS MANAGEMENT (PBM) V. 3.0 time
 period parameters.
 
 Solution:  The code searching for IV and Unit Dose activity within the
 transmitting period has been modified to accommodate the extended periods
 the four packages affected since only one installation is necessary. The
 of time orders may contain an active status as a result of the changes
 introduced by the Inpatient Medications Requirements for the Special 
 Focus Group IRA, Phase I project.
 
 2. Problem: In several extracts only the first portion of the patient
 Integration Control Number is being extracted. The entire Integration
 Control Number needs to be exported.
 
 Solution: Patch PSU*3*34 will correct and extract the entire Integration
 Control Number in the IV multiple (#100) in the Pharmacy Patient file
 patches, in order of install, are:
 (#55) and the UNIT DOSE multiple (#62) in the Pharmacy Patient file
 (#55).
 
 Patch PSU*3*24 will correct the problem in all other applicable files.
 This is being done so that patch 24 and 34 can move forward without
 conflict.
 
      PSS*1*79   PHARMACY DATA MANAGEMENT V. 1.0
      PSJ*5*110  INPATIENT MEDICATIONS V. 5.0
TRACK PACKAGE NATIONALLY YES
BUILD COMPONENTS
  • ENTRIES:
    • PSUIV1
      ACTION:   SEND TO SITE
      CHECKSUM:   B72335798
    • PSUUD1
      ACTION:   SEND TO SITE
      CHECKSUM:   B20884091
    • PSUUD2
      ACTION:   SEND TO SITE
      CHECKSUM:   B16496136