| DESCRIPTION OF ENHANCEMENTS |
The Transitional Pharmacy Benefit (TPB) project that was providing
Step II-The installation of this patch will automatically inactivate all
5. This patch will set the AUTOSTART field (#4.5) of the HL LOGICAL LINK
file (#870) of the PSOTPBAAC Logical Link to "Disabled", to prevent
restarting of the PSOTPBAAC logical link by TaskMan after a system
reboot.
6. The TPB data extraction job is queued to run daily and transmit
data to the AAC every Sunday. This patch will remove the TPB HL7 Data
Extract/Transmission [PSO TPB HL7 EXTRACT] option from the Task
Manager.
the TPB functionality.
Note:
- The post install routine (PSO227PO) included in this patch
addresses all items in step II except #3.
- Most of the TPB routines that are transported in this patch are
modified to "QUIT" if they are ever called by any other routine.
***********************************************************************
*** Step I - Manual Step ***
***********************************************************************
The data transmission of TPB eligible patient from the TPB ELIGIBILITY
file (#52.91) is performed by the PSOTPBACC HL7 logical link.
By now most of the sites would have shut down this link. To check
whether this link is enabled or shutdown, do the following:
functionality to furnish medications prescribed by Non-VA Physicians
a) Use the HL7 Main Menu [HL MAIN MENU] option and select the
Systems Link Monitor [HL MESSAGE MONITOR] option, you should see the
following screen:
SYSTEM LINK MONITOR for BIRMINGHAM, AL. (Test System)
MESSAGES MESSAGES MESSAGES MESSAGES DEVICE
NODE RECEIVED PROCESSED TO SEND SENT TYPE STATE
LL2VISN 51 51 85 51 NC Open
needs to be shut down as the period for its eligibility expired on
NPTF 0 0 163 0 N Halting
PSBCOTS1 2397 Shutdown
PSD HLLP 38 N Halting
PSO DISP 1380 1380 10130 1380 NC Openfail
PSO LLP1 238 N Halting
PSOTPBAA 28 Enabled
PSU SEND 13
TEST 21 21 21 21 SS Idle
Incoming filers running => Zero TaskMan running
October 22, 2004. Inactivation of the TPB functionality will be done in 2
Outgoing filers running => Zero ***LINK MANAGER NOT RUNNING!!!***
Monitor OVERDUE
Select a Command:
b) If the PSOTPBAAC logical link is enabled then you need to shut down
the link by doing the following:
- Use the HL7 Main Menu Option [HL MAIN]
- Select the Filer and Link Management Options
[HL MENU FILER LINK MGT]
- Select the 'Start/Stop Links' option [HL START]
steps, a manual step and a automatic step.
- At the 'Select HL LOGICAL LINK NODE: ' prompt, type PSOTPBAAC and
press enter. The system will prompt 'Okay to shut down this job?',
answer 'YES' and press enter.
The system will display the following message:
'The job for the PSOTPBAAC Lower Level Protocol will be shut down.'
- To ensure the link is shut down use the Systems Link Monitor [HL
MESSAGE MONITOR] option and make sure the status is 'Shutdown'
(step a. above).
*************************************************************************
*** Step II - Automated Step ***
*************************************************************************
1. This patch disables the following menu options by placing them to
be out of order:
- TPB HL7 Data Extract/Transmission [PSO TPB HL7 EXTRACT]
- TPB Institution Letter Enter/Edit [PSO TPB INSTITUTION LETTERS]
- Report TPB Patients Letters Printed/NOT Printed
[PSO TPB LETTERS PRINTED REPORT]
- Transitional Pharmacy Benefit Patient Enter/Edit
[PSO TPB PATIENT ENTER/EDIT]
- TPB Patient Report [PSO TPB PATIENT REPORT]
Step I-To make sure that the Health Level Seven (HL7) data transmission
- Report of Patients with TPB and Non-TPB Rx's
[PSO TPB PATIENT RX REPORT]
- Print TPB Patient Letter(s) [PSO TPB PRINT LETTERS]
- TPB Rx (Prescription) Entry [PSO TPB RX ENTRY]
2. Inactivation of all active TPB patients
This patch will scan all the entries in the TPB ELIGIBILITY file
(#52.91) and will stuff the INACTIVATION OF BENEFIT DATE field (#2)
of the active patients with today's date and the INACTIVATION REASON
CODE field (#3) with the code "10-PROGRAM ENDED".
of TPB eligible patients to the Austin Automation Center (AAC) is
3. When a prescription is discontinued, routine PSOTPCAN is called to
check if that's the last active TPB prescription for an Active TPB
patient, and if so, the patient TPB patient is inactivated from TPB
ELIGIBILITY file (#52.91). Based on the fact that there will be no
active TPB patient upon installing of this patch, routine PSOTPCAN is
modified to quit without checking for last active TPB prescription.
4. Prior to this patch, Outpatient Pharmacy software used to be notified
by the Scheduling software every time a patient has an appointment at a
shutdown.
VA clinic. If the patient is eligible for the TPB benefit, the
appointment was at a clinic defined as primary care for the TPB program
(determined through a set of clinic stop codes) AND the patient does
not have any "active" TPB prescription(s) on file, this patient will
have the TPB eligibility automatically inactivated (introduced by
PSO*7*160). As all active TPB patient's will be inactivated (item #2
above), there is no need for this functionality to continue. This patch
will stop this functionality by removing the PSO TPB SD SUB protocol
entry from the SDAM APPOINTMENT EVENTS Scheduling protocol.
|