PSJ*5.0*229 (9448)    BUILD (9.6)

Name Value
NAME PSJ*5.0*229
DATE DISTRIBUTED 2012-04-26 00:00:00
PACKAGE FILE LINK INPATIENT MEDICATIONS
REQUIRED BUILD
  • PSJ*5.0*213
    ACTION:   Don't install, leave global
TYPE SINGLE PACKAGE
ALPHA/BETA TESTING NO
DESCRIPTION OF ENHANCEMENTS
 Patch PSJ*5.0*229 will correct the following issues.
 schedules and schedules with a frequency greater than 1440 (dose to be 
 given more than once a day) calculate based on days instead of doses.
 
 HD0000000282450 - 4 stop date calculated incorrectly?
 Problem:
 --------
 When finishing a dose limit IV Piggyback order created in CPRS, the stop
 date would not adhere to the dose limit. If there was a stop time defined
 for a particular IV ROOM, the stop time would be tacked on, usually 
 setting the stop date past the last dose of the order. If there was no
 
 stop time defined, the system would tack on .2359 to the stop date, which
 would also usually set the stop date past the dose limit. Both of these
 scenarios would cause additional doses to be given.
 
 HD0000000347116 - 6 Edited infusion rate to remove 250 ml/hr@0 and 
                   scheduled labels still not printing
 Problem:
 --------
 When editing an IV order from an infusion rate with the ATZERO flag set
 to an infusion rate without the ATZERO flag, the labels still don't 
 HD0000000339101 - PSPO# 00001478 - 1 IV order 3x/wk for 8 doses- when 
 print. The ATZERO flag is not being removed by an opposite edit.
 
 HD0000000217087 - IV Time frames in question
 Problem:
 --------
 The duration on IV orders is not calculating correctly. A duration of 23
 hours stops the order after 23 hours, and a duration of 25 hours stops 
 the order after 25 hours; however, a duration of 24 hours stops the 
 order at t+1 day @ 23:59 (23:59 is set by the inpatient ward parameter as
 a default time).
                   stop time is entered as 8, the computer calculates 
                   for 8 days not 8 doses
 Problem:
 --------
 Dose limit calculations are not correct when entered from the 
 infusion dialog in CPRS. There is no logic to calculculate day of week 
TRACK PACKAGE NATIONALLY YES
SEQ# 252
BUILD COMPONENTS
  • ENTRIES:
    • PSIVCAL
      ACTION:   SEND TO SITE
      CHECKSUM:   B75101309
    • PSIVSP
      ACTION:   SEND TO SITE
      CHECKSUM:   B41011288