FBXIP109 ;ALB/RC-PATCH INSTALL ROUTINE ; 12/29/08 1:54pm
Source file <FBXIP109.m>
| Name | Comments | DBIA/ICR reference | 
|---|---|---|
| PS | ; post-install entry point
 ; create KIDS checkpoints with call backs  | 
|
| EN | ; Begin Post-Install
 | 
|
| CF | ; add conversion factors for calendar year 2009 RBRVS fee schedule
 ; File 162.99 is being updated in the post install because the Fee ; Basis software examines this file to determine the latest available ; fee schedule. By doing this at the end of the patch installation, ; users can continue to use the payment options during the install.  | 
|
| POV | ;Update Place of Visit
 | 
|
| NEWTABLE | ;New POVs
 | 
| FileNo | Call Tags | 
|---|---|
| ^FBAA(161.82 - [#161.82] | Classic Fileman Calls |