FBXIP145 ;ALB/RC/DP-PATCH INSTALL ROUTINE ; 11/21/12 12:59pm
Source file <FBXIP145.m>
Name | Comments | DBIA/ICR reference |
---|---|---|
POST | ; post-install entry point
; create KIDS checkpoints with call backs |
|
EN | ; Begin Post-Install
|
|
CF | ; add conversion factors for calendar year 2013 RBRVS fee schedule
; File 162.99 is being updated in the post install because the Fee ; Basis software examines this file to determine the latest available ; fee schedule. By doing this at the end of the patch installation, ; users can continue to use the payment options during the install. |