| DESCRIPTION OF ENHANCEMENTS |
This patch may not be installed during the Y2K Leap Year Lockdown
===========================
1. IF YOUR SITE (HAS NOT) INSTALLED PATCH GEC*2.0*24, THEN (DONOT) INSTALL
THIS PATCH GEC*2.0*25.
2. IF YOUR SITE (HAS) INSTALLED PATCH GEC*2.0*24, THEN PLEASE (DO) INSTALL
THIS PATCH GEC*2.0*25.
Test Sites:
==========
period of 2/28/2000 to 3/3/2000.
Oklahoma, City - 635
Routine Summary:
===============
The following routine(s) are included in this patch. The second line of
each of these routines now looks like:
<tab>;;2.0;GCS;**[Patch List}**;2/14/00
Checksums: CHECK^XTSUMBLD
=========
Rtn Nm Chksum Before Chksum After Patch List
------------------------------------------------------------------
GECSACT New 351621 25
Installation Instruction:
1. The Austin Automation Center VHA Work Measurement(VWM) System will
========================
NOTE OF IMPORTANCE:
Routine will automatically execute in the Post-Install immediately after
the installation of this package. This routine should not be queued to
run at a later time.
1. Users are allowed to be on the system during the Installation.
2. Routine mapping is NOT recommended for these routines. If you
are using routine mapping, review your mapped set and ensure that
not be able to accommendate the inactive segments, all segments in
these routines are NOT in your mapped routine set before proceeding
and rebuild your map set afterward before reactivating TaskMan.
3. Use the "INSTALL/CHECK MESSAGE" option on the PackMan menu. This
loads the patch into a Transport Global onto your system.
4. You Do Not need to stop TaskMan or the background filers.
(AXP Sites - Place TaskMan in a WAIT state.
OpenM/Cache Sites - STOP TaskMan.)
file #2101.2 will be placed in a status of active.
5. On the KIDS menu, select the "Installation" menu and use the
following options to install the Transport Global:
Verify Checksums in Transport Global
Print Transport Global
Compare Transport Global to Current System
Backup a Transport Global
Install Package(s)
INSTALL NAME: GEC*2.0*25
==========
Want KIDS to INHIBIT LOGONs during the install? YES// NO
==
Want to DISABLE Scheduled Options, Menu Options, and
Protocols? YES// NO
==
6. AXP Sites - Answer NO to the question "Want to MOVE routines
to other CPUs?"
7. If the routines were unmapped, the mapped set should be rebuilt
once the installation has run to completion.
8. AXP and OpenM/Cache Sites Only - Remove TaskMan from a WAIT/STOP state.
SPECIAL NOTE OF IMPORTANCE:
|