EC*2.0*162 (12516)    INSTALL (9.7)

Name Value
NAME EC*2.0*162
STATUS Install Completed
PACKAGE FILE LINK EVENT CAPTURE
INSTALL START TIME 2023-10-03 10:23:13
ROUTINE INSTALL TIME 2023-10-03 10:23:13
PRE-INIT CHECK POINTS
  • XPD PREINSTALL COMPLETED
    COMPLETED TIME:   2023-10-03 10:23:13
POST-INIT CHECK POINTS
  • XPD POSTINSTALL COMPLETED
    COMPLETED TIME:   2023-10-03 10:23:13
  • XPD POSTINSTALL STARTED
    COMPLETED TIME:   2023-10-03 10:23:13
    CALLBACK:   POST^EC2P162A
INSTALL COMPLETE TIME 2023-10-03 10:23:13
DATE LOADED 2023-10-03 10:21:34
MESSAGES
 
 Running Post-Install Routine: POST^EC2P162A
 
Updating the EC NATIONAL PROCEDURE File (#725)...
 
*** Changing names in EC NATIONAL PROCEDURE File (#725)...
 
    Entry #3639 for NU189
    ... field (#.01) updated to DRIVE TIME - PT CARE, 5M.
 
    Entry #3991 for NU223
 Install Started for EC*2.0*162 : 
    ... field (#.01) updated to PT CARE DISCUSSION/MTG, 3M.
 
    Entry #3962 for NU500
    ... field (#.01) updated to M&E - NUTR DX RESOLVED, 0M.
 
    Entry #3980 for NU502
    ... field (#.01) updated to M&E - NUTR DX ACTIVE, 0M.
 
    Entry #3981 for NU503
    ... field (#.01) updated to M&E - NUTR DX D/C'D, 0M.
               Oct 03, 2023@10:23:13
 
    Entry #4174 for NU504
    ... field (#.01) updated to M&E - NUTR DX IMPROVED, 0M.
 
    Total 6 names have been changed.
 
*** Changing CPT Codes in EC NATIONAL PROCEDURE file (#725)
 
    Entry #3640 for NU190 updated to use CPT code T1023
    Entry #3644 for NU194 updated to use CPT code T1023
 
    Entry #3990 for NU222 updated to use CPT code 
 
    Total 3 CPT codes have been updated.
 
*** Inactivating procedures in the EC NATIONAL PROCEDURE File (#725)
 
    NU185 inactivated as of 10/1/2023.
    NU186 inactivated as of 10/1/2023.
 
    Total 2 CPT codes have been inactivated.
Build Distribution Date: Jun 11, 2023
 
Queuing the inspection of the EC Event Code Screens file (#720.3)
for 10/02/2023 at 1:00 AM. If this patch is installed after that
time, the inspection will queue immediately.
 
Done. Task: 1479504 has been created for this job. You
will receive a MailMan message with the results on 10/02/2023.
 
Update of EC NATIONAL PROCEDURE file (#725) completed.
 
 
 
 Updating Routine file...
 
 Updating KIDS files...
 
 EC*2.0*162 Installed. 
               Oct 03, 2023@10:23:13
 
 Install Message sent #94300
 Installing Routines:
               Oct 03, 2023@10:23:13
 
STARTING PACKAGE EC*2.0*162
INSTALL ORDER 1
ROUTINES
INSTALL ANSWERS
  • NAME:   XPI1
    PROMPT:   Want KIDS to INHIBIT LOGONs during the install
    EXTERNAL ANSWER:   NO
  • NAME:   XPZ1
    PROMPT:   Want to DISABLE Scheduled Options, Menu Options, and Protocols
    EXTERNAL ANSWER:   NO
DISTRIBUTION DATE 2023-06-11 00:00:00
FILE COMMENT
EMERGENCY Released EC*2*162 SEQ #155
REQUIRED TO CONTINUE NO
SEQ# 155
SETNAME 0EC*2.0*162
DISABLE OPTION DELAY 0
INSTALLED BY USER,EIGHTYNINE