| FileMan FileNo | FileMan Filename | Package |
|---|---|---|
| 6925 | CONSTRUCTION PROJECT | Engineering |
| Package | Total | FileMan Files |
|---|---|---|
| Engineering | 2 | CONSTRUCTION PROJECT(#6925)[#6925.0225(.01)] ENG BUILDING(#6928.3)[20] |
| Package | Total | FileMan Files |
|---|---|---|
| Engineering | 10 | CONSTRUCTION PROJECT(#6925)[#6925.0225(.01)] DIVISION(#6910.3)[159.15, 176] PROJECT STATUS(#6925.2)[6, 15.8] PROJECT EPA CATEGORY(#6925.3)[158.7, 159.8] ENG BUILDING(#6928.3)[#6925.0177(.01)] REGULATORY AGENCY(#7335.7)[#6925.0164(3)] OFM SPACE CLASSIFICATION(#7336.3)[264] OFM H089 CHAPTERS(#7336.6)[#6925.03(.01)] OFM PROJ CATEGORY(#7336.8)[158.1, 158.8, 159.2, 159.9] OFM BUDGET CATEGORY(#7336.9)[158.2, 159.3] |
| Kernel | 2 | INSTITUTION(#4)[3, 15.3] NEW PERSON(#200)[245, 248, 279.1, 279.3] |
| Field # | Name | Loc | Type | Details |
|---|---|---|---|---|
| .01 | PROJECT NUMBER | 0;1 | FREE TEXT | ************************REQUIRED FIELD************************
|
| .05 | FMS # | COMPUTED |
|
|
| 1 | REPORTING PERIOD (Month/Year) | 0;2 | DATE |
|
| 2 | PROJECT TITLE | 0;3 | FREE TEXT | ************************REQUIRED FIELD************************
|
| 2.5 | MONTHLY UPDATES | 0;5 | SET |
|
| 3 | MEDICAL CENTER | 0;4 | POINTER TO INSTITUTION FILE (#4) | ************************REQUIRED FIELD************************ INSTITUTION(#4)
|
| 3.45 | FUNDING YEAR - A/E | 5;7 | NUMBER |
|
| 3.5 | FUNDING YEAR - CONST | 0;7 | NUMBER |
|
| 3.6 | *APPROVAL LEVEL | 0;8 | SET |
|
| 4 | APPROVED CONSTRUCTION | 1;1 | NUMBER |
|
| 5 | APPROVED A/E FUNDING | 5;2 | NUMBER |
|
| 5.1 | TOTAL FUNDS APPROVED | COMPUTED |
|
|
| 6 | STATUS | 1;3 | POINTER TO PROJECT STATUS FILE (#6925.2) | ************************REQUIRED FIELD************************ PROJECT STATUS(#6925.2)
|
| 7 | DESIGN METHOD | 1;4 | SET |
|
| 8 | CONSTR. METHOD | 1;5 | SET |
|
| 8.5 | GROSS SQUARE FEET | 1;10 | NUMBER |
|
| 9 | % SCHEMATICS COMPLETE | 1;6 | NUMBER |
|
| 10 | % CONST DOCS. COMPL | 1;7 | NUMBER |
|
| 11 | % CONSTRUCTION COMPLETE | 1;8 | NUMBER |
|
| 12 | % DESIGN DEV. COMPL | 1;9 | NUMBER |
|
| 13 | % DESIGN PROGRAM COMPL | 1;11 | NUMBER |
|
| 15 | OLD REPORTING PERIOD | 60;2 | DATE |
|
| 15.1 | OLD PROJECT TITLE | 60;3 | FREE TEXT |
|
| 15.2 | OLD MONTHLY UPDATE | 60;5 | SET |
|
| 15.3 | OLD MEDICAL CENTER | 60;4 | POINTER TO INSTITUTION FILE (#4) | INSTITUTION(#4)
|
| 15.4 | OLD FUNDING YEAR (A/E) | 64;7 | NUMBER |
|
| 15.5 | OLD FUNDING YEAR CONST. | 60;7 | NUMBER |
|
| 15.6 | OLD APPROVED CONST. FUNDING | 60;11 | NUMBER |
|
| 15.7 | OLD APPROVED A/E FUNDING | 64;2 | NUMBER |
|
| 15.8 | OLD STATUS | 60;13 | POINTER TO PROJECT STATUS FILE (#6925.2) | PROJECT STATUS(#6925.2)
|
| 15.9 | OLD DESIGN METHOD | 60;14 | SET |
|
| 16 | OLD CONSTRUCTION METHOD | 60;15 | SET |
|
| 16.1 | OLD GROSS SQUARE FEET | 60;20 | NUMBER |
|
| 16.2 | OLD % SCHEMATICS COMPLETE | 60;16 | NUMBER |
|
| 16.3 | OLD % CD COMPLETE | 60;17 | NUMBER |
|
| 16.4 | OLD % CONSTRUCTION COMPLETE | 60;18 | NUMBER |
|
| 16.5 | OLD % DD COMPLETE | 60;19 | NUMBER |
|
| 16.6 | OLD % DESIGN PROGRAM COMPLETE | 60;21 | NUMBER |
|
| 20 | DESIGN PROGRAM START (PLANNED) | 50;8 | DATE |
|
| 20.1 | DESIGN PROGRAM COMP. (PLANNED) | 50;9 | DATE |
|
| 20.3 | ADVERTISE FOR A/E (PLANNED) | 50;11 | DATE |
|
| 20.4 | SELECT A/E (PLANNED) | 50;12 | DATE |
|
| 20.5 | A/E AWARD (PLANNED) | 50;13 | DATE |
|
| 21 | START SCHEMATICS (PLANNED) | 2;2 | DATE |
|
| 22 | COMPLETE SCHEMATICS (PLANNED) | 2;3 | DATE |
|
| 22.5 | START DESIGN DEV. (PLANNED) | 50;2 | DATE |
|
| 22.6 | COMPL. DESIGN DEV. (PLANNED) | 50;3 | DATE |
|
| 23 | START/AWARD CD (PLANNED) | 2;4 | DATE |
|
| 24 | COMPL. CONST. DOCS. (PLANNED) | 2;5 | DATE |
|
| 24.4 | START L/T REVIEW (PLANNED) | 56;1 | DATE |
|
| 24.6 | START AUDIT REVIEW (PLANNED) | 56;4 | DATE |
|
| 25 | ISSUE IFB/SBA (PLANNED) | 2;6 | DATE |
|
| 25.4 | COMPL. L/T REVIEW (PLANNED) | 56;7 | DATE |
|
| 25.6 | COMPL. AUDIT REVIEW (PLANNED) | 56;10 | DATE |
|
| 26 | BID OPEN/NEGOTIATION (PLANNED) | 2;7 | DATE |
|
| 27 | CONSTRUCTION AWARD (PLANNED) | 2;8 | DATE |
|
| 28 | CONSTRUCTION START (PLANNED) | 2;9 | DATE |
|
| 29 | CONST. COMPLETE (PLANNED) | 2;10 | DATE |
|
| 30 | ACTIVATION (PLANNED) | 50;4 | DATE |
|
| 32 | OLD DESIGN PROGRAM START (PL) | 66;8 | DATE |
|
| 32.1 | OLD DESIGN PROGRAM COMP. (PL) | 66;9 | DATE |
|
| 32.3 | OLD ADVERTISE FOR A/E (PL) | 66;11 | DATE |
|
| 32.4 | OLD SELECT A/E (PL) | 66;12 | DATE |
|
| 32.5 | OLD A/E AWARD (PL) | 66;13 | DATE |
|
| 32.6 | OLD START SCHEMATICS (PL) | 61;2 | DATE |
|
| 32.7 | OLD COMPLETE SCHEMATICS (PL) | 61;3 | DATE |
|
| 32.8 | OLD START DD (PL) | 66;2 | DATE |
|
| 32.9 | OLD COMPLETE DD (PL) | 66;3 | DATE |
|
| 33 | OLD START CD (PL) | 61;4 | DATE |
|
| 33.1 | OLD COMPLETE CD (PL) | 61;5 | DATE |
|
| 33.14 | OLD START L/T REVIEW (PL) | 69;1 | DATE |
|
| 33.16 | OLD START AUDIT REVIEW (PL) | 69;4 | DATE |
|
| 33.2 | OLD ISSUE IFB (PL) | 61;6 | DATE |
|
| 33.24 | OLD COMPL. L/T REVIEW (PL) | 69;7 | DATE |
|
| 33.26 | OLD COMPL. AUDIT REVIEW (PL) | 69;10 | DATE |
|
| 33.3 | OLD BID OPEN (PL) | 61;7 | DATE |
|
| 33.4 | OLD CONSTRUCTION AWARD (PL) | 61;8 | DATE |
|
| 33.5 | OLD CONSTRUCTION START (PL) | 61;9 | DATE |
|
| 33.6 | OLD CONST. COMPLETE (PL) | 61;10 | DATE |
|
| 33.7 | OLD ACTIVATION (PL) | 66;4 | DATE |
|
| 34 | DESIGN PROGRAM START (REVISED) | 50;5 | DATE |
|
| 34.1 | DESIGN PROGRAM COMP. (REVISED) | 50;6 | DATE |
|
| 34.3 | ADVERTISE FOR A/E (REVISED) | 50;14 | DATE |
|
| 34.4 | SELECT A/E (REVISED) | 50;15 | DATE |
|
| 34.5 | A/E AWARD (REVISED) | 50;16 | DATE |
|
| 35 | START SCHEMATICS (REVISED) | 3;1 | DATE |
|
| 36 | COMPLETE SCHEMATICS (REVISED) | 3;2 | DATE |
|
| 36.1 | START DESIGN DEV. (REVISED) | 50;17 | DATE |
|
| 36.2 | COMPL. DESIGN DEV. (REVISED) | 50;18 | DATE |
|
| 37 | START/AWARD CD (REVISED) | 3;3 | DATE |
|
| 38 | COMPL. CONST. DOCS. (REVISED) | 3;4 | DATE |
|
| 38.4 | START L/T REVIEW (REVISED) | 56;2 | DATE |
|
| 38.6 | START AUDIT REVIEW (REVISED) | 56;5 | DATE |
|
| 39 | ISSUE IFB/SBA (REVISED) | 3;5 | DATE |
|
| 39.4 | COMPL. L/T REVIEW (REVISED) | 56;8 | DATE |
|
| 39.6 | COMPL. AUDIT REVIEW (REVISED) | 56;11 | DATE |
|
| 40 | BID OPEN/NEGOTIATION (REVISED) | 3;6 | DATE |
|
| 41 | CONSTRUCTION AWARD (REVISED) | 3;7 | DATE |
|
| 42 | CONSTRUCTION START (REVISED) | 3;8 | DATE |
|
| 43 | CONST. COMPLETE (REVISED) | 3;9 | DATE |
|
| 44 | ACTIVATION (REVISED) | 50;19 | DATE |
|
| 46 | OLD DESIGN PROGRAM START (REV) | 66;5 | DATE |
|
| 46.1 | OLD DESIGN PROGRAM COMP. (REV) | 66;6 | DATE |
|
| 46.2 | OLD AUTHR. LTR. REC'D. (REV) | 66;7 | DATE |
|
| 46.3 | OLD ADVERTISE FOR A/E (REV) | 66;14 | DATE |
|
| 46.4 | OLD SELECT A/E (REV) | 66;15 | DATE |
|
| 46.5 | OLD A/E AWARD (REV) | 66;16 | DATE |
|
| 46.6 | OLD START SCHEMATICS (REV) | 62;1 | DATE |
|
| 46.7 | OLD COMPLETE SCHEMATICS (REV) | 62;2 | DATE |
|
| 46.8 | OLD START DD (REV) | 66;17 | DATE |
|
| 46.9 | OLD COMPLETE DD (REV) | 66;18 | DATE |
|
| 47 | OLD START CD (REV) | 62;3 | DATE |
|
| 47.1 | OLD COMPLETE CD (REV) | 62;4 | DATE |
|
| 47.14 | OLD START L/T REVIEW (REV) | 69;2 | DATE |
|
| 47.16 | OLD START AUDIT REVIEW (REV) | 69;5 | DATE |
|
| 47.2 | OLD ISSUE IFB (REV) | 62;5 | DATE |
|
| 47.24 | OLD COMPL. L/T REVIEW (REV) | 69;8 | DATE |
|
| 47.26 | OLD COMPL. AUDIT REVIEW (REV) | 69;11 | DATE |
|
| 47.3 | OLD BID OPEN (REV) | 62;6 | DATE |
|
| 47.4 | OLD CONSTRUCTION AWARD (REV) | 62;7 | DATE |
|
| 47.5 | OLD CONSTRUCTION START (REV) | 62;8 | DATE |
|
| 47.6 | OLD CONSTRUCTION COMP. (REV) | 62;9 | DATE |
|
| 47.7 | OLD ACTIVATION (REV) | 66;19 | DATE |
|
| 49 | DESIGN PROGRAM START (ACTUAL) | 51;1 | DATE |
|
| 49.1 | DESIGN PROGRAM COMPL. (ACTUAL) | 51;2 | DATE |
|
| 50 | AUTHORIZED (ACTUAL) | 4;1 | DATE |
|
| 51 | ADVERTISE FOR A/E (ACTUAL) | 4;2 | DATE |
|
| 52 | SELECT A/E (ACTUAL) | 4;3 | DATE |
|
| 53 | A/E AWARD (ACTUAL) | 4;4 | DATE |
|
| 54 | START SCHEMATICS (ACTUAL) | 4;5 | DATE |
|
| 55 | COMPLETE SCHEMATICS (ACTUAL) | 4;6 | DATE |
|
| 55.5 | START DESIGN DEV. (ACTUAL) | 4;14 | DATE |
|
| 55.6 | COMPL. DESIGN DEV. (ACTUAL) | 4;15 | DATE |
|
| 56 | START/AWARD CD (ACTUAL) | 4;7 | DATE |
|
| 57 | COMPL. CONST. DOCS. (ACTUAL) | 4;8 | DATE |
|
| 57.4 | START L/T REVIEW (ACTUAL) | 56;3 | DATE |
|
| 57.6 | START AUDIT REVIEW (ACTUAL) | 56;6 | DATE |
|
| 58 | ISSUE IFB/SBA (ACTUAL) | 4;9 | DATE |
|
| 58.4 | COMPL. L/T REVIEW (ACTUAL) | 56;9 | DATE |
|
| 58.6 | COMPL. AUDIT REVIEW (ACTUAL) | 56;12 | DATE |
|
| 59 | BID OPEN/NEGOTIATION (ACTUAL) | 4;10 | DATE |
|
| 60 | CONSTRUCTION AWARD (ACTUAL) | 4;11 | DATE |
|
| 61 | CONSTRUCTION START (ACTUAL) | 4;12 | DATE |
|
| 62 | CONST. COMPLETE (ACTUAL) | 4;13 | DATE |
|
| 63 | ACTIVATION (ACTUAL) | 51;3 | DATE |
|
| 65 | OLD DESIGN PROGRAM START (ACT) | 67;1 | DATE |
|
| 65.1 | OLD DESIGN PROGRAM COMP. (ACT) | 67;2 | DATE |
|
| 65.2 | OLD AUTHORIZED (ACT) | 63;1 | DATE |
|
| 65.3 | OLD ADVERTISE FOR A/E (ACT) | 63;2 | DATE |
|
| 65.4 | OLD SELECT A/E (ACT) | 63;3 | DATE |
|
| 65.5 | OLD A/E AWARD (ACT) | 63;4 | DATE |
|
| 65.6 | OLD START SCHEMATICS (ACT) | 63;5 | DATE |
|
| 65.7 | OLD COMPL. SCHEMATICS (ACT) | 63;6 | DATE |
|
| 65.8 | OLD START CD (ACT) | 63;7 | DATE |
|
| 65.9 | OLD COMPLETE CD (ACT) | 63;8 | DATE |
|
| 65.94 | OLD START L/T REVIEW (ACT) | 69;3 | DATE |
|
| 65.96 | OLD START AUDIT REVIEW (ACT) | 69;6 | DATE |
|
| 66 | OLD ISSUE IFB (ACT) | 63;9 | DATE |
|
| 66.04 | OLD COMPL. L/T REVIEW (ACT) | 69;9 | DATE |
|
| 66.06 | OLD COMPL. AUDIT REVIEW (ACT) | 69;12 | DATE |
|
| 66.1 | OLD BID OPEN (ACT) | 63;10 | DATE |
|
| 66.2 | OLD CONSTRUCTION AWARD (ACT) | 63;11 | DATE |
|
| 66.3 | OLD CONSTRUCTION START (ACT) | 63;12 | DATE |
|
| 66.4 | OLD CONST. COMPLETE (ACT) | 63;13 | DATE |
|
| 66.5 | OLD ACTIVATION (ACT) | 67;3 | DATE |
|
| 66.6 | OLD START DD (ACT) | 63;14 | DATE |
|
| 66.7 | OLD COMPLETE DD (ACT) | 63;15 | DATE |
|
| 70 | A/E CONTRACT # | 5;1 | FREE TEXT |
|
| 71.5 | A/E FUND CONTROL POINT | 51;4 | FREE TEXT |
|
| 71.6 | A/E AWARD AMOUNT | 5;9 | NUMBER |
|
| 71.7 | A/E STUDY | 51;6 | NUMBER |
|
| 72 | A/E SCHEMATICS | 5;3 | NUMBER |
|
| 72.3 | A/E SITE SURVEY | 5;10 | NUMBER |
|
| 72.5 | A/E DESIGN DEVELOPMENT | 51;7 | NUMBER |
|
| 73 | A/E CONST DOCUMENTS | 5;4 | NUMBER |
|
| 74 | A/E SITE VISITS | 5;5 | NUMBER |
|
| 75 | A/E CONST PER SERVCS | 5;6 | NUMBER |
|
| 75.5 | A/E OTHER SERVICES | 51;8 | NUMBER |
|
| 76 | A/E SUBTOTAL | COMPUTED |
|
|
| 77 | A/E SA ADDITIONS (#) | 51;9 | NUMBER |
|
| 78 | A/E SA ADDITIONS ($) | 51;10 | NUMBER |
|
| 79 | A/E SA DEDUCTIONS (#) | 51;11 | NUMBER |
|
| 80 | A/E SA DEDUCTIONS ($) | 51;12 | NUMBER |
|
| 81 | A/E SA NET ($) | COMPUTED |
|
|
| 82 | A/E OBLIGATED | COMPUTED |
|
|
| 85 | A/E NAME | 6;1 | FREE TEXT |
|
| 86 | A/E ADDR1 | 6;2 | FREE TEXT |
|
| 87 | A/E ADDR2 | 6;3 | FREE TEXT |
|
| 90 | OLD A/E CONTRACT # | 64;1 | FREE TEXT |
|
| 90.2 | OLD FCP (A/E) | 67;4 | FREE TEXT |
|
| 90.25 | OLD A/E AWARD AMOUNT | 64;9 | NUMBER |
|
| 90.3 | OLD A/E OBLIG. (STUDY) | 67;6 | NUMBER |
|
| 90.4 | OLD A/E OBLIG. (SCHEMATICS) | 64;3 | NUMBER |
|
| 90.45 | OLD A/E OBLIG. (SITE SURVEY) | 64;10 | NUMBER |
|
| 90.5 | OLD A/E OBLIG. (DD) | 67;7 | NUMBER |
|
| 90.6 | OLD A/E OBLIG. (CD) | 64;4 | NUMBER |
|
| 90.7 | OLD A/E OBLIG. (SITE VISIT) | 64;5 | NUMBER |
|
| 90.8 | OLD A/E OBLIG (CONST PER SRVC) | 64;6 | NUMBER |
|
| 90.9 | OLD A/E OBLIG. (OTHER) | 67;8 | NUMBER |
|
| 91 | OLD A/E SA ADDITIONS (#) | 67;9 | NUMBER |
|
| 91.1 | OLD A/E SA ADDITIONS ($) | 67;10 | NUMBER |
|
| 91.2 | OLD A/E SA DEDUCTIONS (#) | 67;11 | NUMBER |
|
| 91.3 | OLD A/E SA DEDUCTIONS ($) | 67;12 | NUMBER |
|
| 95 | *INIT. NOTIFICATION - SBA | 7;1 | DATE |
|
| 96 | *WD & SPECIFICATIONS - SBA | 7;2 | DATE |
|
| 97 | *CONTR INIT PROP - SBA | 7;3 | DATE |
|
| 98 | *REQ FOR PRE-AWARD - SBA | 7;4 | DATE |
|
| 99 | *COMPL OF PRE-AWARD - SBA | 7;5 | DATE |
|
| 105 | CONST. CONTRACT # | 8;1 | FREE TEXT |
|
| 105.5 | CONST FUND CONTROL PT | 51;5 | FREE TEXT |
|
| 106 | CONSTRUCTION AWARD | 8;2 | NUMBER |
|
| 107 | P&H LABOR TO DATE | 53;1 | NUMBER |
|
| 108 | P&H MATERIALS TO DATE | 53;2 | NUMBER |
|
| 109 | TOTAL P&H | COMPUTED |
|
|
| 110 | OLD CONST. CONTRACT # | 64;11 | FREE TEXT |
|
| 110.2 | OLD FCP (CONST.) | 67;5 | FREE TEXT |
|
| 110.3 | OLD ORIG. CONSTRUCTION AWARD | 64;12 | NUMBER |
|
| 110.4 | OLD P&H LABOR TO DATE | 68;11 | NUMBER |
|
| 110.5 | OLD P&H MATERIAL TO DATE | 68;12 | NUMBER |
|
| 115 | CONTR. NAME | 9;1 | FREE TEXT |
|
| 116 | CONTR. ADDR1 | 9;2 | FREE TEXT |
|
| 117 | CONTR. ADDR2 | 9;3 | FREE TEXT |
|
| 125 | CONST SA ADDITIONS (#) | 10;1 | NUMBER |
|
| 126 | CONST SA ADDITIONS ($) | 10;2 | NUMBER |
|
| 127 | CONST SA DEDUCTIONS (#) | 10;3 | NUMBER |
|
| 128 | CONST SA DEDUCTIONS ($) | 10;4 | NUMBER |
|
| 128.2 | CONST SUPPL (NET $) | COMPUTED |
|
|
| 129 | TOTAL CONST OBLIGATION | COMPUTED |
|
|
| 129.1 | TIME EXTENSION (DAYS) | 53;3 | NUMBER |
|
| 130 | TOTAL PROJ OBLIGATION | COMPUTED |
|
|
| 135 | OLD CONST. ADD. (#) | 64;21 | NUMBER |
|
| 135.1 | OLD CONST. ADD. ($) | 64;22 | NUMBER |
|
| 135.2 | OLD CONST. DED. (#) | 64;23 | NUMBER |
|
| 135.3 | OLD CONST. DED. ($) | 64;24 | NUMBER |
|
| 135.4 | OLD TIME EXTENSION (DAYS) | 68;13 | NUMBER |
|
| 145 | REMARKS | 12;0 | WORD-PROCESSING #6925.01 |
|
| 146 | PROGRESS NOTE | 13;1 | FREE TEXT |
|
| 146.1 | OLD PROGRESS NOTE | 65;1 | FREE TEXT |
|
| 151 | DATE OF LAST ELECT. 10-0051 | 11;4 | DATE |
|
| 152 | LAST REPORTING PERIOD | 50;1 | DATE |
|
| 153 | *SCOPE REDUCED | 8;3 | SET |
|
| 154 | *CURRENT A/E ESTIMATE | 1;2 | NUMBER |
|
| 155 | PROGRAM | 0;6 | SET | ************************REQUIRED FIELD************************
|
| 156 | APPROVAL LEVEL | 0;8 | SET |
|
| 157.5 | *AVG. WORK FORCE (P&H) | 11;1 | NUMBER |
|
| 157.6 | *MAN HOURS (P&H) | 11;2 | NUMBER |
|
| 157.7 | WAGES (P&H) | 11;3 | NUMBER |
|
| 158 | FACILITY TYPE | 52;6 | SET | ************************REQUIRED FIELD************************
|
| 158.1 | PROJECT CATEGORY | 52;1 | POINTER TO OFM PROJ CATEGORY FILE (#7336.8) | ************************REQUIRED FIELD************************ OFM PROJ CATEGORY(#7336.8)
|
| 158.2 | BUDGET CATEGORY | 52;2 | POINTER TO OFM BUDGET CATEGORY FILE (#7336.9) | ************************REQUIRED FIELD************************ OFM BUDGET CATEGORY(#7336.9)
|
| 158.3 | NHCU BEDS (NEW) | 52;3 | NUMBER |
|
| 158.4 | NHCU BEDS (RENOVATED) | 52;4 | NUMBER |
|
| 158.5 | NHCU BEDS (CONVERTED) | 52;5 | NUMBER |
|
| 158.6 | EPA REPORTABLE | 52;7 | SET |
|
| 158.7 | EPA REPORTING CATEGORY | 52;8 | POINTER TO PROJECT EPA CATEGORY FILE (#6925.3) | PROJECT EPA CATEGORY(#6925.3)
|
| 158.8 | BONUS CATEGORY | 52;9 | POINTER TO OFM PROJ CATEGORY FILE (#7336.8) | OFM PROJ CATEGORY(#7336.8)
|
| 158.9 | AMBULATORY CARE PERCENTAGE | 52;10 | NUMBER |
|
| 159 | OLD PROGRAM | 60;6 | SET |
|
| 159.1 | OLD FACILITY TYPE | 68;6 | SET |
|
| 159.15 | OLD DIVISION | 70;1 | POINTER TO DIVISION FILE (#6910.3) | DIVISION(#6910.3)
|
| 159.2 | OLD PROJECT CATEGORY | 68;1 | POINTER TO OFM PROJ CATEGORY FILE (#7336.8) | OFM PROJ CATEGORY(#7336.8)
|
| 159.3 | OLD BUDGET CATEGORY | 68;2 | POINTER TO OFM BUDGET CATEGORY FILE (#7336.9) | OFM BUDGET CATEGORY(#7336.9)
|
| 159.4 | OLD NHCU BEDS (NEW) | 68;3 | NUMBER |
|
| 159.5 | OLD NHCU BEDS (RENOVATED) | 68;4 | NUMBER |
|
| 159.6 | OLD NHCU BEDS (CONVERTED) | 68;5 | NUMBER |
|
| 159.7 | OLD EPA REPORTABLE | 68;7 | SET |
|
| 159.8 | OLD EPA REPORTING CATEGORY | 68;8 | POINTER TO PROJECT EPA CATEGORY FILE (#6925.3) | PROJECT EPA CATEGORY(#6925.3)
|
| 159.9 | OLD BONUS CATEGORY | 68;9 | POINTER TO OFM PROJ CATEGORY FILE (#7336.8) | OFM PROJ CATEGORY(#7336.8)
|
| 161 | EMERGENCY/INTERIM APPLICATION | 15;13 | SET |
|
| 162 | EQPMT OVER $250K APPLICATION | 15;14 | SET |
|
| 163 | CAPITAL LEASE PROGRAM | 15;15 | SET |
|
| 164 | CITATIONS | 21;0 | Multiple #6925.0164 | 6925.0164
|
| 165 | PROJ CATEGORY >75% SCOPE | 18;4 | SET |
|
| 165.1 | NHCU AUTHORIZED BEDS | 53;4 | NUMBER |
|
| 166 | NHCU CONVERSION | 57;0 | SET Multiple #6925.0166 | 6925.0166 |
| 176 | DIVISION | 15;1 | POINTER TO DIVISION FILE (#6910.3) | DIVISION(#6910.3)
|
| 177 | BUILDING NUMBER | 34;0 | POINTER Multiple #6925.0177 | 6925.0177
|
| 178 | BLDG DISPLAY | COMPUTED |
|
|
| 179 | BLDG OCCUPANCY | 15;4 | SET |
|
| 180 | H089 | 22;0 | POINTER Multiple #6925.03 | 6925.03
|
| 181 | 5 YR FACILITY PLAN FY | 15;6 | NUMBER |
|
| 181.1 | FIVE YR PLAN STATUS | 15;16 | SET |
|
| 181.2 | 5 YR PLAN STATUS DATE | 15;19 | DATE |
|
| 182 | PLANNED CONSTRUCTION METHOD | 15;7 | SET |
|
| 185.1 | OLD NHCU AUTHORIZED BEDS | 68;14 | NUMBER |
|
| 186 | OLD NHCU CONVERSION | 58;0 | SET Multiple #6925.0186 | 6925.0186 |
| 187 | ENVIRONMENTAL ASSESSMENT REQD | 15;12 | SET |
|
| 187.5 | ACTIVATION RESOURCES REQ IN FY | 24;1 | NUMBER |
|
| 188 | RECURRING ALL OTHER $ | 24;2 | NUMBER |
|
| 189 | ADDITIONAL FTEE | 24;3 | NUMBER |
|
| 190 | RECURRING PS | 24;4 | NUMBER |
|
| 190.2 | EQUIPMENT $ | 24;5 | NUMBER |
|
| 190.3 | NONRECURRING ALL OTHER | 24;6 | NUMBER |
|
| 190.4 | TRAVEL .007 | 24;7 | NUMBER |
|
| 190.6 | EQUIPMENT OVER $250K | 25;0 | Multiple #6925.04 | 6925.04
|
| 191 | NET BED CHANGE | 15;2 | NUMBER |
|
| 192 | PROJECT DESCRIPTION (SHORT) | 17;0 | WORD-PROCESSING #6925.0192 |
|
| 192.3 | JUSTIFICATION (SHORT) | 26;0 | WORD-PROCESSING #6925.05 |
|
| 192.6 | WORKLOAD | 27;0 | WORD-PROCESSING #6925.06 |
|
| 193 | ENVIRONMENT IMPACT STMT REQD | 16;5 | SET |
|
| 194 | ADDITIONAL DOCUMENTATION REQD | 16;6 | SET |
|
| 194.5 | FURTHER REQD ACTION | 16;1 | FREE TEXT |
|
| 194.6 | EVALUATOR | 16;2 | FREE TEXT |
|
| 194.7 | DATE OF EVALUATION | 16;3 | DATE |
|
| 195 | ACQUIRES OR DISPOSES LAND | 16;7 | SET |
|
| 195.1 | A1 LAND USE TEXT | 42;1 | FREE TEXT |
|
| 196 | AFFECTS WETLANDS/FLOOD PLAINS | 16;8 | SET |
|
| 196.1 | A2 LAND USE TEXT | 42;2 | FREE TEXT |
|
| 197 | INVOLVES STORM WATER RUNOFF | 16;9 | SET |
|
| 197.1 | A3 LAND USE TEXT | 42;3 | FREE TEXT |
|
| 198 | CONFLICTS W LOCAL ZONING | 16;10 | SET |
|
| 198.1 | A4 LAND USE TEXT | 42;4 | FREE TEXT |
|
| 199 | DISLOCATES PEOPLE/RESIDENCES | 16;11 | SET |
|
| 199.1 | A5 LAND USE TEXT | 43;1 | FREE TEXT |
|
| 200 | AFFECTS PROTECTED FAUNA/FLORA | 16;12 | SET |
|
| 200.1 | A6 LAND USE TEXT | 43;2 | FREE TEXT |
|
| 201 | OUTSIDE CONST GT 10000 SQ FT | 16;13 | SET |
|
| 201.1 | B1 CONSTRUCTION TEXT | 44;1 | FREE TEXT |
|
| 202 | INCREASE OFF SITE TRAFFIC >10% | 16;14 | SET |
|
| 202.1 | B2 CONSTRUCTION TEXT | 44;2 | FREE TEXT |
|
| 203 | SIGNIF ALTER OFF SITE TRAFFIC | 16;15 | SET |
|
| 203.1 | B3 CONSTRUCTION TEXT | 44;3 | FREE TEXT |
|
| 204 | INVOLVE HISTORIC AREA/BLDGS | 16;16 | SET |
|
| 204.1 | B4 CONSTRUCTION TEXT | 44;4 | FREE TEXT |
|
| 205 | EMISSION/WATER QUALITY PROBLEM | 16;17 | SET |
|
| 205.1 | C1 EMISSION/TOXINS TEXT | 45;1 | FREE TEXT |
|
| 206 | PUBLIC CONTROVERSY | 16;18 | SET |
|
| 206.1 | D1 PUBLIC CONTROVERSY TEXT | 45;2 | FREE TEXT |
|
| 207 | CONFLICT LOCAL/STATE REGS | 16;19 | SET |
|
| 207.1 | D2 PUBLIC CONTROVERSY TEXT | 45;3 | FREE TEXT |
|
| 208 | OVERLOAD UTILITY SYS CAPACITY | 16;20 | SET |
|
| 208.1 | D3 UTLITY OVERLOAD TEXT | 45;4 | FREE TEXT |
|
| 209 | VAMC PRIORITY | 15;9 | NUMBER |
|
| 209.1 | MCPS SCORE | 24;8 | NUMBER |
|
| 210 | REGIONAL PRIORITY | 15;10 | NUMBER |
|
| 212 | ESTIMATED COST FOR 5 YR PLAN | COMPUTED |
|
|
| 212.1 | ESTIMATED A/E COST (FYFP) | 19;10 | NUMBER |
|
| 212.2 | ESTIMATED CONST COST (FYFP) | 19;11 | NUMBER |
|
| 213 | TOTAL M AND R COSTS | 19;1 | NUMBER |
|
| 214 | TOTAL BSEA COSTS | 19;2 | NUMBER |
|
| 215 | TOTAL BSER COSTS | 19;3 | NUMBER |
|
| 216 | TOTAL MI COSTS | 19;4 | NUMBER |
|
| 217 | NRM TOTAL COST | COMPUTED |
|
|
| 218 | *CONTINGENCY PCT MI/MA | COMPUTED |
|
|
| 218.1 | CONTINGENCY DOLLARS | COMPUTED |
|
|
| 218.2 | NRM CONTINGENCY PCT | 19;5 | NUMBER |
|
| 218.3 | MI/MA CONTINGENCY PCT | 19;12 | NUMBER |
|
| 219 | IMPACT COST | 19;7 | NUMBER |
|
| 220 | TECHNICAL SERVICES PCT | COMPUTED |
|
|
| 220.1 | TECHNICAL SERVICES $ | 19;6 | NUMBER |
|
| 221 | MINOR/MAJOR CONST COSTS | 19;8 | NUMBER |
|
| 222 | TOTAL PROJECT COST | COMPUTED |
|
|
| 223 | NET PARKING CHANGE | 15;3 | NUMBER |
|
| 225 | DOMINOS | 20;0 | POINTER Multiple #6925.0225 | 6925.0225
|
| 231 | FDP UPDATE COMPLETED | 15;5 | SET |
|
| 233 | VAMC MINOR/MINOR MISC SCORE | COMPUTED |
|
|
| 233.1 | MI/MM CITATION POINTS | COMPUTED |
|
|
| 233.2 | MI/MM SPACE POINTS | COMPUTED |
|
|
| 233.3 | MI/MM ENERGY POINTS | COMPUTED |
|
|
| 233.4 | MI/MM CATEGORY POINTS | COMPUTED |
|
|
| 233.5 | MI/MM VAMC PRIORITY POINTS | COMPUTED |
|
|
| 234 | REGION SCORE | 24;10 | NUMBER |
|
| 235 | TOTAL PROJECT SCORE | COMPUTED |
|
|
| 236 | SIR RATING | 15;11 | NUMBER |
|
| 236.1 | ENERGY CONSERVATION PROJECT | 15;17 | SET |
|
| 236.2 | APPROVED IN 5YR ENERGY PLAN | 15;18 | SET |
|
| 237 | SITE ISSUES | 29;1 | FREE TEXT |
|
| 238 | HISTORICAL ISSUES | 29;2 | FREE TEXT |
|
| 238.5 | ENVIRONMENTAL ISSUES | 32;2 | FREE TEXT |
|
| 239 | SEISMIC ISSUES | 30;1 | FREE TEXT |
|
| 240 | HAZARDOUS MATERIALS ISSUES | 30;2 | FREE TEXT |
|
| 241 | TRANSPORT ISSUES | 31;1 | FREE TEXT |
|
| 242 | PARKING ISSUES | 31;2 | FREE TEXT |
|
| 243 | *IMPACT ISSUES | 32;1 | FREE TEXT |
|
| 244 | CHIEF ENGINEER APPROVED | 33;1 | SET |
|
| 245 | CHIEF ENGINEER NAME | 33;2 | POINTER TO NEW PERSON FILE (#200) | NEW PERSON(#200)
|
| 246 | CHIEF ENG SIGN DATE | 33;3 | DATE |
|
| 247 | VAMC DIRECTOR APPROVED | 33;4 | SET |
|
| 248 | VAMC DIRECTOR/DESIGNEE NAME | 33;5 | POINTER TO NEW PERSON FILE (#200) | NEW PERSON(#200)
|
| 249 | VAMC DIRECTOR SIGN DATE | 33;6 | DATE |
|
| 251 | PROJ APPLICATION STATUS | 49;4 | SET |
|
| 261 | TOTAL FACTORED SQUARE FOOTAGE | 18;1 | NUMBER |
|
| 262.1 | NRM FACILITY PRIORITY POINTS | COMPUTED |
|
|
| 262.2 | NRM FACTORED SQ FOOTAGE POINTS | COMPUTED |
|
|
| 262.3 | NRM CATEGORY POINTS | COMPUTED |
|
|
| 262.4 | NRM CITATION POINTS | COMPUTED |
|
|
| 262.5 | NRM ENERGY POINTS | COMPUTED |
|
|
| 262.6 | NRM CONSTRUCTION COST | COMPUTED |
|
|
| 262.7 | NRM BONUS POINTS | COMPUTED |
|
|
| 263 | NRM VAMC SCORE | COMPUTED |
|
|
| 264 | SPACE USE FOR PRIORITIZATION | 18;2 | POINTER TO OFM SPACE CLASSIFICATION FILE (#7336.3) | OFM SPACE CLASSIFICATION(#7336.3)
|
| 265 | SEISMIC AREA | 18;3 | SET |
|
| 277 | LONG DESCRIPTION | 46;0 | WORD-PROCESSING #6925.0277 |
|
| 278 | LONG JUSTIFICATION | 47;0 | WORD-PROCESSING #6925.0278 |
|
| 279 | DATE TRANSMIT IN 5YR PLAN | 33;7 | DATE |
|
| 279.1 | TRANSMITTER 5YR PLAN | 33;8 | POINTER TO NEW PERSON FILE (#200) | NEW PERSON(#200)
|
| 279.2 | DATE TRANSMIT PROJ APPLICATION | 33;9 | DATE |
|
| 279.3 | TRANSMITTER PROJ APPLICATION | 33;10 | POINTER TO NEW PERSON FILE (#200) | NEW PERSON(#200)
|
| 282 | IMPACT JUSTIFICATION | 54;0 | WORD-PROCESSING #6925.0282 |
|
| 285 | LEASE TYPE | 55;1 | SET |
|
| 286 | FY AWARD LEASE | 55;2 | NUMBER |
|
| 287 | FY RENT STARTS | 55;3 | NUMBER |
|
| 288 | ESTIMATED LUMP SUM COST | 55;4 | NUMBER |
|
| 289 | ESTIMATED ANNUAL RENT COST | 55;5 | NUMBER |
|
| 290 | PROPOSED LEASE TERM | 55;6 | NUMBER |
|
| 291 | RENTABLE SQ FT | 55;7 | NUMBER |
|
| 292 | EXISTING SPACE ANNUAL RENT | 55;8 | NUMBER |
|
| 293 | EXISTING SPACE RENTABLE SQ FT | 55;9 | NUMBER |
|
| 301 | COMMUNICATION LOG | 80;0 | WORD-PROCESSING #6925.0301 |
|