Home   Package List   Routine Alphabetical List   Global Alphabetical List   FileMan Files List   FileMan Sub-Files List   Package Component Lists   Package-Namespace Mapping  
Info |  Details
Print Page as PDF
Sub-Field: 6925.04

Package: Engineering

CONSTRUCTION PROJECT(#6925)-->6925.04

Sub-Field: 6925.04


Information

Parent File Name Number Package
CONSTRUCTION PROJECT(#6925) EQUIPMENT OVER $250K 6925.04 Engineering

Details

Field # Name Loc Type Details
.01 EQUIPMENT OVER $250K NAME 0;1 FREE TEXT

  • INPUT TRANSFORM:  K:$L(X)>30!($L(X)<3) X
  • LAST EDITED:  FEB 14, 1994
  • HELP-PROMPT:  Answer must be 3-30 characters in length.
  • DESCRIPTION:  
    This field contains a 3-30 character name for an equipment item over $250,000.
  • CROSS-REFERENCE:  6925.04^B
    1)= S ^ENG("PROJ",DA(1),25,"B",$E(X,1,30),DA)=""
    2)= K ^ENG("PROJ",DA(1),25,"B",$E(X,1,30),DA)
1 QUANTITY 0;2 NUMBER

  • INPUT TRANSFORM:  K:+X'=X!(X>999)!(X<1)!(X?.E1"."1N.N) X
  • LAST EDITED:  APR 26, 1993
  • HELP-PROMPT:  Type a Number between 1 and 999, 0 Decimal Digits
  • DESCRIPTION:  
    This field contains the quantity of the equipment item.
2 UNIT COST 0;3 NUMBER

  • INPUT TRANSFORM:  K:+X'=X!(X>99999999)!(X<250000)!(X?.E1"."1N.N) X
  • LAST EDITED:  APR 26, 1993
  • HELP-PROMPT:  Enter a whole dollar amount between 250000 and 99999999
  • DESCRIPTION:  
    This field contains the unit cost of the equipment item.
3 LINE ITEM AMT COMPUTED

  • MUMPS CODE:  S Y(6925.04,3,1)=$S($D(^ENG("PROJ",D0,25,D1,0)):^(0),1:"") S X=$P(Y(6925.04,3,1),U,2)*$P(Y(6925.04,3,1),U,3)
  • ALGORITHM:  #1*#2
  • LAST EDITED:  DEC 30, 1992
  • DESCRIPTION:  
    This field contains the computed total cost of an equipment item.
4 ADDITIONAL/REPLACEMENT 0;4 SET
  • 'A' FOR ADDITIONAL;
  • 'R' FOR REPLACEMENT;

  • LAST EDITED:  APR 29, 1994
  • HELP-PROMPT:  Enter 'A' if additional equipment or 'R' if replacement equipment.
  • DESCRIPTION:  
    This field identifies equipment over $250K as additional or replacement equipment.
Info |  Details